We started working with Cascade Renewable Energy, a division of Cascade Engineering, over the fall and winter to capture a large solar panel installation at Louis Padnos Iron & Metal Co.
We installed a 20-foot scaffolding rig on the rooftop and mounted a timelapse DSLR photography system to capture the process, as well as b-roll on our JVC HM 700.
Rapid Growth covered the solar story here.
You can watch the video below:
3.11.2010
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment